1½ STOREY DETACHED FACTORY

TYPE C
1½ STOREY DETACHED FACTORY

(approx. 2 acres/above)

LAND AREA
Approx. 79,104.96 - 103,939.44 sq.ft.
GROSS FLOOR AREA
Approx. 58,074 - 74,216 sq.ft.
Factory Height
:
9 m
Floor Design Loads
Production area (Ground Floor)
:
20kN/m², Non-Suspended Floor Slab
Office Area (Mezzanine Floor)
:
2.5kN/m²
Roof Design Loads
Production Area Roof
:
Imposed dead load = 0.25kN/m² (Load of Rafter, Purlin, Metal Roofing Sheet, Insulation, Lighting Fitting, Sprinkler pipe and Gypsum Board Ceiling with Aluminium Tee Frame.) Live load= 0.25kN/m²
Roof Systems
Roof Structure
:
Structural Steel designed to BS 5950 Standard
Roof Sheets
:
Zincalume Metal Roof c/w 50mm thick fiber glass insulation
Rain Water Down Pipe
:
Exposed 150mm Ø UPVC pipe (Production Area) Concealed 150mm Ø UPVC pipe (Office Area)
Gutter
:
Stainless Steel Gutter
Walls
Internal Wall (Office and Sprinkler Tank Area)
:
115mm thick common brick wall with plaster and painted with emulsion paint.
:
Ceramic wall tiles to toilets (2.1m High)
External Wall (Office Area)
:
115mm thick common brick wall with plaster and painted with weather bond paint.
External Wall (Production Area)
:
Brick wall and/or Precast wall and painted with weather bond paint
Floor
Ground floor
:
150mm thick G25 concrete with a layer of polythene sheet and BRC A7
Production Finishes
:
4kg/m² floor harderner finishes
Office & Lobby Finishes
:
Polished tiles
Lobby Staircase Finishes
:
Polished tiles
Toilet Floor Finishes
:
Matt Surface Ceramic Tiles
Doors
External Doors
:
Motorized Roller Shutters and Mild Steel Doors (Production Area)
:
Tempered glass door (Entrance Area)
Internal Doors
:
Fire-rated Door (based on local authority requirement) & Timber Flush Door (Office Area)
Windows
External Windows
:
NA Aluminium Casement Window (Production Area)
:
Reflective Glass Curtain Wall (Office Area)
:
Aluminium Framed Top Hung Windows (Office Area)
Ceiling
Office Area
:
2ft x 4ft Gypsum Pin Hole False Ceiling (Office Area)
:
Gypsum Board Plaster Ceiling (Lobby Area)
Production Area
:
Exposed Steel Structure (No Ceiling)
Infrastructure Works
External Road
:
150mm thick Reinforced Concrete Road c/w road marking
Parking Bays
:
150mm thick Reinforced Concrete Road c/w parking lot
Fencing
:
Front Signage : 11m length Common Brick Wall with c/w plaster cement and painted with weatherbond paint
:
Perimeter : 150mm High Kerb with 1.8m High BSP Fencing
Gate
:
9m Wide Sliding Gate Without Motor
:
Power Point for Motor Provided
Drainage System
:
Concealed Pipe Culvert Drain
Sewerage System
:
Vitrified clay pipe (VCP) connect to main sewerage line
Bin Center
:
1 no.
Guardhouse
:
1 no.
Sprinkler Tank & Plinth
:
1 no.
TNB Sub-station
:
Subject to appropriate authority requirement
Dock Leveller
:
Subject to design
Standard Mechanical & Electrical Specification
MSB 1000A (setting 600A)
:
1 no.
DB 150A
:
2 no.
DB 60A
:
2 nos.
DB 30A
:
1 no.
Lighting Point
:
138 nos.
13A S/S/O
:
43 nos.
15A Air-Cond Power Point
:
3 nos.
Emergency Light
:
34 nos.
Keluar sign
:
11 nos.
Telephone MDP
:
3 nos.
Data Point
:
2 nos.
30A Isolator Point
:
9 nos.
Fire Protection Systems
Fire Alarm System
:
Yes
Hosereel System
:
Yes
Automatic Sprinkler System (Ordinary Hazard)
:
Yes
Portable Fire Extinguisher
:
Yes
Hydrant System
:
Yes
Plumbing & Water Recticulation Systems
Water Tank for Toilet only
:
Yes
Incoming Domestic Piping & Discharged Piping
:
Yes